| Step
One |
Mix
epoxy and prepare the liner |
| |
|
| Step
Two |
Place
bladder and liner into place, inflate and allow to dry |
| |
|
| Step
Three |
Remove
bladder and reinstate line, if needed |
|
|
The
Cured-In-Place Technology

Millions of linear feet of cured-in-place materials have been installed
worldwide. They have withstood every corrosive environment plus
the test of
time. Billions of dollars have been saved because excavation was
eliminated.
Cured-in-place materials mold to the host pipe. This seamless pipe
prevents
infiltration and exfiltration, restores structural integrity, eliminates
joints that can weaken and allow root intrusion. Cured-in-place
pipe
actually increases flow capacity because the ACE DuraFlo pipe is
much
smoother than old clay and concrete pipe. Above ground there are
no piles of
excavated dirt, no traffic tie-ups, no subcontractors and most importantly,
a happy customer. |
|