|
|
Project Type: Ben Taub General Hospital has garnered the respect of the world as an elite Level 1 Trauma Center, one of only two in the Harris County area. The sanitary sewer drain line system at the hospital was experiencing frequent blockages and back-ups. However, due to the hospital’s operational needs, the sanitary sewer system has to remain in operation 24/7. This greatly limited repair options. TDT Plumbing designed and executed a rehabilitation plan that kept the sanitary sewer drain line system in operation during its CIPP Liner installation. |
|
|
Project Type: |
|
|
Project Type: |
|
|
Project Type: |
View Demos
To view all of our video demos
CLICK HERE >>